Biannual Inspection of CO2 Fixed System

SKU: 72873
0 out of 5

774.84 €
(exc. tax)

Out of stock

Category:

Description

All high pressure cylinders and pilot cylinders should be weighed or have their contents verified by other reliable means to confirm that the available charge in each is above 90% of the nominal charge. Cylinders containing less than 90% of the nominal charge should be refilledthe hydrostatic test date of all storage containers should be checked. the discharge piping and nozzles should be tested to verify that they are not blocked. test should be performed by isolating the discharge piping from the system and flowing dry air or nitrogen from test cylinders or suitable means through the piping. At least biennially (intervals of 2 years ± 3 months) in passenger ships the following maintenance should be carried out by service technicians/specialists that are in possession of a Certificate of Approval as Service Suppliers issued by a Recognized Organization. where possible, all activating heads should be removed from the cylinder valves and tested for correct functioning by applying full working pressure through the pilot lines. In cases where this is not possible, pilot lines should be disconnected from the cylinder valves and blanked off or connected together and tested with full working pressure from the release station and checked for leakage.In both cases this should be carried out from one or more release stations when installed. If manual pull cables operate the remote release controls, they should be checked to verify the cables and corner pulleys are in good condition and freely move and do not require an excessive amount of travel to activate the system. cable components should be cleaned and adjusted as necessary, and the cable connectors should be properly tightened If the remote release controls are operated by pneumatic pressure, the tubing should be checked for leakage, and the proper charge of the remote releasing station pilot gas cylinders should be verified. All controls and warning devices should function normally, and the time delay, if fitted should prevent the discharge of gas for the required time period. and after completion of the work, the system should be returned to service. All releasing controls should be verified in the proper position and connected to the correct control valves. All pressure switch interlocks should be reset and returned to service. All stop valves should be in the closed position.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Marine Expertise Help choosing equipment for your boat
Trusted Brands Marine equipment from established manufacturers
Delivery Options Contact us for shipping costs and delivery times
Personal Support Ask us about compatibility before ordering